Liquid Waste & Septic System Fees

JULY 1, 2025 through JUNE 30, 2026

EFFECTIVE JULY 1, 2025 

DESCRIPTION

PE

FEE

Standard System Installation

4220

$1,653.00

Alternative/Experimental System Installation

4221

$2,422.00

Standard System Repair

4230

$1,469.00

Alternative/Experimental System Repair

4231

$1,718.00

Tank Replacement

4232

$1,268.00

Septic Abandon/Destruction

4264

$  662.00

 

Holding Tank (Temporary)

4280

$  720.00

Holding Tank (Fixed/Special Condition)

4281

$  720.00

Test Drills/Liquid Waste Program

4240

$1,505.00

Engineering/Perc Test Review

4241

$1,515.00

Plot Plan Review/Approval

4242

$  655.00

OWTS Operating Permit—Tier 1 (Annual)

4250

$  968.00

OWTS Operating Permit—Tier 2 (3 year)

4251

$  279.00

OWTS Operating Permit—Tier 3 (5 year)

4252

$ 147.00

OWTS Operating Permit (Fee exempt)

4253

$   00.00

Consultation

4265

*Hourly

Wet Weather Testing

4266

*Hourly

Report Submittal

4267

*Hourly

Field Inspection

4268

*Hourly

Septic Tank Cleaner Registration

4270

$ 678.00

Pumper Truck/Portable Toilet Facility—Tier 1 (Annual)

4274

$ 1,100.00

Pumper Truck/Portable Toilet Facility—Tier 2 (3 year)

4275

$ 366.00

Pumper Truck/Portable Toilet Facility—Tier 3 (5 year)

4276

$ 216.00

Bank Letter

4243

*Hourly

Variance

4244

*Hourly

Sanitary Sewer Waiver

4245

*Hourly

Wastewater Processing Treatment Facility

4278

 $ 1,574.00

*Hourly Rate: $232.00

Note: Permits must be obtained from this office prior to initiating work on septic systems.