Liquid Waste Program Fees
Effective July 1, 2026 through June 30, 2027.
Hourly Rate: $232 per hour.
| Code | Description | Fee |
| 4201 | Enforcement | Hourly Rate |
| 4202 | Complaint Investigation | Hourly Rate |
| 4210 | Septic Maintenance Districts | Hourly Rate |
| 4220 | Standard System Installation | $1,729 |
| 4221 | Alternative/Experimental System Installation | $2,492 |
| 4230 | Standard System Repair | $1,474 |
| 4231 | Alternative/Experimental System Repair | $1,767 |
| 4232 | Tank Replacement | $1,344 |
| 4240 | Test Drill, Soil Study | $1,549 |
| 4241 | Engineering/Perc Test Review | $1,588 |
| 4242 | Plot Plan Review/Approval | $747 |
| 4243 | Bank Letter | Hourly Rate |
| 4244 | Variance | Hourly Rate |
| 4245 | Sanitary Sewer Waiver | Hourly Rate |
| 4250 | Onsite Wastewater Treatment System (OWTS) Operating Permit: Tier 1 (Annual) | $996 |
| 4251 | Onsite Wastewater Treatment System (OWTS) Operating Permit: Tier 2 (3 Year) | $287 |
| 4252 | Onsite Wastewater Treatment System (OWTS) Operating Permit: Tier 3 (5 Year) | $151 |
| 4264 | Septic Abandon / Destruction | $711 |
| 4265 | Consultation | Hourly Rate |
| 4266 | Wet Weather Testing | Hourly Rate |
| 4267 | Report Submittal | Hourly Rate |
| 4268 | Field Inspection (Additional) | Hourly Rate |
| 4270 | Septic Tank Cleaner Truck Registration | $698 |
| 4274 | Pumper Truck / Portable Toilet Facility - Tier 1 (Annual) | $1,132 |
| 4275 | Pumper Truck / Portable Toilet Facility - Tier 2 (3 Year) | $377 |
| 4276 | Pumper Truck / Portable Toilet Facility - Tier 3 (5 Year) | $222 |
| 4278 | Wastewater Processing Treatment Facility | $1,620 |
| 4280 | Holding Tank Permit (Temporary) | $741 |
| 4281 | Holding Tank Permit (Fixed / Special Condition) | $741 |