Environmental Protection Division 2026-2027 Fees

Environmental Protection Division 2026-2027 Fees

Effective July 1, 2026 through June 30, 2027.

Hourly Rate: $232 per hour.

CodeDescriptionFee
2611Subdivision Tentative Map (Any)$690
2612Subdivision Vesting Map (Any)$547
2615Subdivision Time Extension - PRJ $313
2616Subdivision Time Extension - BS$307
2617Vesting Map Extension - BS$308
2620Parcel Map - BS$690
2621Parcel Map - PRJ$690
2622Parcel Map - SRC$690
2623Boundary Line Adjustment - Staff Level$587
2624Boundary Line Adjustment$589
2625Parcel Map Extension – SRC$307
2626Parcel Map Extension – BS$307
2660Land Use Program ConsultationHourly Rate
2661Temporary Mobile Home$313
2662Use Permit - PRJ$561
2663Use Permit - BS$561
2664Use Permit - ZA$561
2665Rezone$313
2666Variance - ZA$587
2667Variance - BS$589
2670Planning / Building / Code Electronic Holds Review and Release (e.g., contaminated sites) Hourly Rate
2677Environmental Impact Review$1,738
2678Environmental Impact Statement$1,739
2688General Plan Amendment$314
2689Community Plan Amendment$587
2690Community Plan Amendment and Rezone$510
2694Development Plan Review - Project$501
2695Development Plan Review -BS$510
2696Development Plan Review - Planning Department$690
2697Development Plan Review - Single Family$690

CodeDescriptionFee
4110Plan ReviewHourly Rate
4121Recycled Water - SCWA Shut Down TestHourly Rate

CodeDescriptionFee
4201EnforcementHourly Rate
4202Complaint InvestigationHourly Rate
4210Septic Maintenance DistrictsHourly Rate
4220Standard System Installation $1,729
4221Alternative/Experimental System Installation$2,492
4230Standard System Repair$1,474
4231Alternative/Experimental System Repair$1,767
4232Tank Replacement$1,344
4240Test Drill, Soil Study$1,549
4241Engineering/Perc Test Review$1,588
4242Plot Plan Review/Approval$747
4243Bank LetterHourly Rate
4244VarianceHourly Rate
4245Sanitary Sewer Waiver Hourly Rate
4250Onsite Wastewater Treatment System (OWTS) Operating Permit: Tier 1 (Annual)$996
4251Onsite Wastewater Treatment System (OWTS) Operating Permit: Tier 2 (3 Year)$287
4252Onsite Wastewater Treatment System (OWTS) Operating Permit: Tier 3 (5 Year)$151
4264Septic Abandon / Destruction$711
4265ConsultationHourly Rate
4266Wet Weather TestingHourly Rate
4267Report SubmittalHourly Rate
4268Field Inspection (Additional)Hourly Rate
4270Septic Tank Cleaner Truck Registration$698
4274Pumper Truck / Portable Toilet Facility - Tier 1 (Annual)$1,132
4275Pumper Truck / Portable Toilet Facility - Tier 2 (3 Year)$377
4276Pumper Truck / Portable Toilet Facility - Tier 3 (5 Year)$222
4278Wastewater Processing Treatment Facility$1,620
4280Holding Tank Permit (Temporary)$741
4281Holding Tank Permit (Fixed / Special Condition)$741

CodeDescriptionFee
4905Cathodic Protection, Geothermal Heat Exchange$1,761
4910Well w/Pump Installation$1,868
4912Vault Box Repair (Facility Permit Expires in One Year)$917
4913Vault Box ELD Wells (Facility Permit Expires in One Year)$863
4930Supply Well Destruction (e.g. Domestic, Municipal, Ag., Commercial/Industrial)$1,625
4940Well w/o Pump (Monitoring Well, Extraction Well, Soil Vapor Extraction Well, Piezometer(+/- pump))$1,256
494DMonitoring Well Destruction $1,335
4942Soil Borings - Construction and Destruction (Exploratory Hole (Boring) within 10 feet of groundwater such as: Seismic, Site Assessment or Geotech Boring and soil vapor probes)$1,154
4960Well Inactivation$886
4965Pump Installation / Replacement / Repair$406
496RWell Repair, Deepening, Re-casing$835
4989Renewal of Abandoned Well Inactivation Permit$290
4997Abandoned Well Inactivation$886

CodeDescriptionFee
4720Backflow Tester Certification$318
4701Per Tag Cost$37

CodeDescriptionFee
4610Small Water Systems – Non-Community Ground Water$1,206
4611Small Water Systems – Non-Community Ground Water w/ Treatment$2,086
4612Small Water Systems – Non-Community Surface Water$2,086
4632State Small Water System 5-14$949
4640Non-Transient, Non-Community (<1K Population) Ground Water$1,902
4641Non-Transient, Non-Community (<1K Population) Ground Water w/ Treatment$3,013
4642Non-Transient, Non-Community (<1K Population) Surface Water$3,013
4650Non-Transient, Non-Community (>1K Population) Ground Water$3,013
4651Non-Transient, Non-Community (>1K Population) Ground Water w/Treatment$3,476
4652Non-Transient, Non-Community (>1K Population) Surface Water$3,707
4660Community Water System (<100 Connections) Ground Water$2,777
4661Community Water System (<100 Connections) Ground Water w/ Treatment$3,381
4662Community Water System (<100 Connections) Surface Water$4,028
4670Community Water System (>100 Connections) Ground Water$2,859
4671Community Water System (>100 Connections) Ground Water w/ Treatment$3,939
4672Community Water System (>100 Connections) Surface Water$4,393
4680Small Water System – New Permit Application$1,159
4690Small Water System - Permit Amendment$1,159
4695Small Water System Repair Permit$938

CodeDescriptionFee
4404New Solid Waste Project Application$3,204
4423Refuse Vehicle$150
4433Nontraditional FacilityHourly Rate
4434Inert Debris Engineered Fill Operation$4,490
4435Suspended Activity/Permitted Site (Not Landfill)Hourly Rate
4436Municipal Solid Waste Landfill$42,158
4437Construction/Demo/Inert Landfill$33,808
4441Composting Facility (Annual Inspection)$1,492
4442Composting Facility (Monthly Inspection)$17,586
4443Composting Facility (Quarterly Inspection)$6,102
4445Transfer Station: Large Volume, Monthly Inspection$19,751
4446Transfer Station: Small Volume, Quarterly Inspection$4,806
4447Transfer Station: Medium Volume, Monthly Inspection$16,701
4448Transfer Station: Annual Inspection$1,173
4450CDI Trans/ Proc.: Large Volume, Monthly Inspection$16,550
4451CDI Trans/ Proc.: Medium Volume, Monthly Inspection$13,867
4452CDI Trans/ Proc.: Small Volume, Quarterly Inspection$4,806
4453Chip/Grind: Small Volume, Quarterly Inspection$4,806
4454Chip/Grind: Medium Volume, Monthly Inspection$13,867
4455Chip/Grind: Large Volume, Monthly Inspection$16,550
4460Closed Site, Quarterly Inspection$4,818
4461Sludge, Land ApplicationHourly Rate
4479Closed Site, Annual Inspection$1,205
4480Closed Site, Biannual Inspection$2,409

CodeDescriptionFee
5101Hazardous Materials Land Use FeeHourly Rate
5203Hazardous Materials Disclosure Fee 1-3 Materials$634
5204Hazardous Materials Disclosure Fee 4-6 Materials$811
5205Hazardous Materials Disclosure Fee 7-9 Materials$1,013
5206Hazardous Materials Disclosure Fee 10-15 Materials$1,508
 Each Additional 5 Materials$179
5214Hazardous Materials in Reportable Qty - Waste Only$473
5217CERS Data EntryHourly Rate

CodeDescriptionFee
5304 / 5334Hazardous Waste Generator Fee - <55 Gallons$413
5305 / 5335Hazardous Waste Generator Fee 55-500 Gallons$572
5306 / 5336Hazardous Waste Generator Fee 500-2500 Gallons$878
5307 / 5337Hazardous Waste Generator Fee 2500-7500 Gallons$1,082
5308 / 5338Hazardous Waste Generator Fee 7500-12,000 Gallons$1,238
--Each Additional 5,000 Gallons$275

CodeDescriptionFee
5551Conditionally Exempt (CE): <55 Gallons per month $320
5552Conditionally Authorized (CA): >55 Gallons per month$959
5553Permit By Rule (PBR)$959
5554Household Hazardous Waste - Permanent $1,773

CodeDescriptionFee
5441Aboveground Storage Tank: 1,320 to <10,000 Gallons$546
5442Aboveground Storage Tank: 10,000 to <100,000 Gallons$868
5443Aboveground Storage Tank: 100,000 to <1,000,000 Gallons$1,010
5444Aboveground Storage Tank: 1,000,000 to <10,000,000 Gallons $1,257
5445Aboveground Storage Tank: 10,000,000 to <100,000,000 Gallons $1,424
5446Aboveground Storage Tank: >100,000,000 Gallons$1,424
5448Aboveground Storage Tank: Conditionally Exempt $227
5449Aboveground Storage Tank: Tank In An Underground Area (TIUGA) $456

CodeDescriptionFee
5411Underground Storage Tank Operating Permit – 1 Tank$2,441
5412Underground Storage Tank Operating Permit – 2 Tanks$2,648
5413Underground Storage Tank Operating Permit – 3 Tanks$3,072
5414Underground Storage Tank Operating Permit – 4 Tanks$3,229
5415Underground Storage Tank Operating Permit – 5 Tanks$3,435
5416Underground Storage Tank Operating Permit – 6 Tanks$3,640
5417Underground Storage Tank Operating Permit – 7 Tanks$3,826
5418Underground Storage Tank Operating Permit – 8 Tanks$4,028
5419Underground Storage Tank Operating Permit – 9 Tanks$4,183
5420Underground Storage Tank Operating Permit – 10 Tanks$4,372
--Underground Storage Tank Operating Permit - Each Additional Tank$419
5421Underground Storage Tank - VPH Surcharge$229
5450Underground Storage Tank Installation - 1 Tank $8,912
Underground Storage Tank Installation - 2 Tanks$9,443
Underground Storage Tank Installation - 3 Tanks$9,937
Underground Storage Tank Installation - 4 Tanks$10,489
Underground Storage Tank Installation - 5 Tanks$11,145
--Underground Storage Tank Installation - Each Additional $2,329
5452Upgrade to Existing UST System, Including Piping - 1 Tank$3,891
Upgrade to Existing UST System, Including Piping - 2 Tanks$3,974
Upgrade to Existing UST System, Including Piping - 3 Tanks$4,176
Upgrade to Existing UST System, Including Piping - 4 Tanks$4,349
Upgrade to Existing UST System, Including Piping - 5 Tanks$4,521
--Upgrade to Existing UST System, Including Piping - Each Additional Tank$1,338
5453Upgrade to Existing UST system, Without Piping - 1 Tank$3,339
Upgrade to Existing UST system, Without Piping - 2 Tanks$3,394
Upgrade to Existing UST system, Without Piping - 3 Tanks$3,588
Upgrade to Existing UST system, Without Piping - 4 Tanks$3,776
Upgrade to Existing UST system, Without Piping - 5 Tanks$3,936
--Upgrade to Existing UST System, Without Piping - Each Additional Tank$1,338
5454Underground Storage Tank Repair: Tank, Piping or Monitoring System$2,793
5455Underground Storage Tank Repair: Spill Containment $2,185
5460Tank Removal and Permanent Closure In Place - 1 Tank$2,628
Tank Removal and Permanent Closure In Place - 2 Tanks$2,881
Tank Removal and Permanent Closure In Place - 3 Tanks$3,135
Tank Removal and Permanent Closure In Place - 4 Tanks$3,379
Tank Removal and Permanent Closure In Place - 5 Tanks$3,629
--Tank Removal and Permanent Closure In Place - Each Additional Tank$1,267
5461Underground Storage Tank Temporary Closure - 1 Year$1,518

CodeDescriptionFee
5901California Accidental Release Prevention: Program Level 1 Plan Review$2,527
5903California Accidental Release Prevention: Program Level 2 or 3 Plan Review$5,544
5904California Accidental Release Prevention: Plan Review/Update/RevisionHourly Rate
5911California Accidental Release Prevention: Annual Activity, Program Level 1 $2,048
5912California Accidental Release Prevention: Annual Activity, Program Level 2$4,659
5913California Accidental Release Prevention: Annual Activity, Program Level 3$6,282
5921California Accidental Release Prevention: Additional Covered Process$1,943
5961California Accidental Release Prevention: Annual Activity, First Additional NCWS$237

CodeDescriptionFee
5601Incident Response/Complaints/InvestigationsHourly Rate

CodeDescriptionFee
5802Local Remediation Program OversightHourly Rate

CodeDescriptionFee
5810ConsultingHourly Rate

CodeDescriptionFee
5806Special Handling for Expedited Document ReviewCall Dept. 

CodeDescriptionFee
5050Payment Plan Administrative Processing Fee$120